Lake Winn Commences Drilling On The Cloud Project

December 10th, 2020

Lake Winn Resources Corp. is pleased to announce it has commenced drilling on the Cloud project, in the Flin Flon gold belt, Manitoba. 

The first runs of core are being recovered from drill hole CP-2020-01. The hole is being drilled at an azimuth of 3450 and a dip of 500. This hole is targeting the western side of the Bachnick gold zone (see figure 1). The 320m long zone is defined by over a dozen pits which returned gold values from grab and channel samples. It is hosted in mafic meta-volcanics and is estimated to be 115m wide at this point. The northern edge of this unit is marked by a distinct resistivity anomaly that also coincides with the Mikanagan fault. The plan is to drill across this zone and through the resistivity anomaly and the fault to the rocks beyond and complete the hole at plus/minus 200m depth. The concept is that the resistivity anomaly represents silica flooding from mineralizing fluids using the fault as a conduit. The mafic volcanics act as a chemical trap for these fluids. The hole, therefore, has two targets the geochemical anomaly of the Bachnick gold zone and the conceptual anomaly of the resistivity zone hosted by the Mikanagan fault. 

The company plans a minimum of 1500m to 3,000m of drilling during this campaign and will continue to make public with news releases, milestones as the campaign progresses.

Lake Winn Resources Corp. Drilling Program
Figure 1: Bachnick gold prospect, showing first drill hole CP-2020-01

Qualified Person

The Qualified Person for this news release is Buddy Doyle, AUSIMM, a Geologist of over 30 years’ experience in mineral exploration, discovery, and evaluation. A Qualified Person under the provisions of National Instrument 43-101. Carey Galeschuk, P. Geo.  the project manager is a registered professional geologist in Manitoba. 

About Lake Winn 

Lake Winn Resources Corp., is a Vancouver based gold company, listed on the TSX Venture Exchange (Symbol: LWR) focusing on exploration and development of gold projects in Canada. The company’s flagship property, the Cloud Project is in the province of Manitoba, in the Flin Flon Gold Belt approximately 40 kilometers north‐east of the town of Flin‐Flon. Access to the property is provided by Manitoba highway 10 to the all‐weather Kississing Lake Road. The company is currently preparing for diamond drilling. 

On Behalf of the Board of Directors of Lake Winn Resources Corp.

Patrick Power, President & CEO
+1 (604) 218-8772

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

LAKE WINN ANNOUNCES PRIVATE PLACEMENT

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE UNITED STATES Vancouver, British Columbia – May 23, 2024 – Lake Winn Resources Corp. (TSXV: LWR, FSE: EE1A) (the “Company”) is pleased to announce a non-brokered private...

Lake Winn Mobilizes Summer Program NWT Canada

Vancouver, British Columbia – August, 23rd 2023 – Lake Winn Resources Corp. (“Lake Winn” or the “Company”) (TSXV: LWR) (FSE: EE1A) is pleased to announce that it has commenced mobilization on the Company's LNPG Lithium pegmatite project on the Yukon/Northwest...

LAKE WINN PROVIDES UPDATE ON SPIN-OUT FINANCING

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE UNITED STATES Vancouver, British Columbia – August 22, 2023 – Lake Winn Resources Corp. (TSXV: LWR, FSE: EE1A) (the “Company”) announces that Gold Winn Resources Corp. (“Gold...

LAKE WINN PROVIDES UPDATE ON SPIN-OUT

THIS NEWS RELEASE IS NOT FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES FOR DISSEMINATION IN THE UNITED STATES Vancouver, British Columbia – August 16, 2023 – Lake Winn Resources Corp. (TSXV: LWR, FSE: EE1A) (the “Company”) is pleased to announce that in connection with...